Managing Worksteps for Projects

You can manage project worksteps on the Worksteps tab in the project profile. To access the Worksteps tab, do the following:

  1. Open the project profile.
  2. Click Worksteps on the navigation panel.
    • The top portion of the window displays a grid listing all the worksteps in the project.
    • If you click Show Details, the bottom portion of the window displays a grid with detailed information about a workstep selected in the workstep grid.

You can perform the following tasks on this window:

Workstep Grid

The grid in the upper portion of the window lists all the worksteps in this project. The order in which the worksteps are listed is the order in which they must be completed. The exception is for the child worksteps within a workstep group. The child worksteps are typically completed concurrently. All child worksteps in a group must be completed before the workstep group can be marked completed.

Click a link below to learn more about the elements available for the workstep grid.

.

Workstep Details

If you select a workstep in the workstep grid and then click Show Details, a lower pane containing detailed information for the selected workstep displays. If you prefer, you can also display the detailed workstep information as a separate window by double-clicking a workstep in the upper grid.

You can edit the workstep details by clicking on one of tabs in this section. To learn more about the information on these tabs, click a link below.

Note: If you select a workstep group in the grid, only two tabs display: Worksteps Included and Status. See Viewing Workstep Group Details for information about these tabs.